Projects

If you’d like to talk to us about a project, or anything else, we’d love to hear from you.

S/N Project Description Completion Date Status Client
1 Construction of Fuel Supply Facility at NIMASA March 2015 Completed Nigeria Maritime Administration and Safefy Agency
2 Supply Of Radiomatic HBC FSE 516 Set Alum Casing Complete Set February 2015 Completed United Cement Company Nigeria Limited
3 Supply Of 1 Ton Cast Iron Standard February 2015 Completed United Cement Company Nigeria Limited
4 Supply Of Load Cell For Belt Weighers February 2015 Completed United Cement Company Nigeria Limited
5 Supply of Box AISI Metal 63mm X 52mm C/W Steel Cable Gland and Cover January 2015 Completed United Cement Company Nigeria Limited
6 Supply of Coupling Flexible A15 July 2014 Completed United Cement Company Nigeria Limited
7 Supply of Indexable Insert Boring/Cutting Tools June 2014 Completed United Cement Company Nigeria Limited
8 Supply of Replacements Parts/Spares for Spectrophotometer May 2014 Completed Mobil Producing Nigeria Unlimited
9 Supply of Accumulator Pressure Switch May 2014 Completed United Cement Company Nigeria Limited
10 Supply of 25Ton Telemetry Load Cell May 2014 Completed Exmatsur Group
11 Supply of Fittings for FUN Electrical & Instrumentation Project April 2014 Completed Frontier Oil Limited
12 Supply of Filter Regulator Unit March 2014 Completed United Cement Company Nigeria Limited
13 Frame Agreement on supply of all Cygnus products N/A Ongoing Addax Petroleum Development
14 Transformer Oil Versus Oil Filteration Services March 2014 Completed United Cement Company Nigeria Limited
15 Supply of Pressure Switch for Speed Boat Sep-2009 Completed Saipem Contracting Nigeria Ltd
16 Supply of Proximity Magnetic Switch Sep-2009 Completed Saipem Contracting Nigeria Ltd
17 Supply of MSA Orion Gas Detectors JAug-2009 Completed Saipem Contracting Nigeria Ltd
18 Replacement of AGO and PMS Electrical Panel Aug-2009 Completed Mobil Producing Nigeria Unlimited
19 Provision of facility integrity test on fuel storage tanks Nov-2008 Completed Mobil Producing Nigeria Unlimited
S/N Project Description Completion Date Status Client
1 Fuel storage tanks integrity test (VTT) at Bonny River Terminal March 2015 Ongoing Mobil Producing Nigeria Unlimited
2 Fuel Storage Tank Integrity Test (VTT) at Qua Iboe Terminal March 2015 Ongoing Mobil Producing Nigeria Unlimited
3 Fuel storage tanks integrity tests at Bonny River Terminal March 2015 Completed Mobil Producing Nigeria Unlimited
4 Provision of Fuel Storage Tanks Integrity Test for Regulatory Compliance License Renewal N/A Ongoing Mobil Producing Nigeria Unlimited
5 Load Testing – Over Head Cranes March 2014 Completed Aveon Offshore
6 Volumetric Tank Thickness Test (VTT) February 2014 Completed United Cement Company Nigeria Limited
7 NDT and Visual test on racks and shelves May 2014 Completed Mobil Producing Nigeria Unlimited
S/N Project Description Completion Date Status Client
1 Integrity test on Storage Rack at Bonny River Terminal March 2015 Ongoing Mobil Producing Nigeria Unlimited
2 Annual Rig Condition Survey /Cerification Of Adriatic 10 February 2015 Completed Shelf Drilling
3 Annual Rig Condition Survey /Certification Of Adriatic 9 February 2015 Completed Shelf Drilling
4 Annual Rig Condition Survey /Certification Of Adriatic 1 February 2015 Completed Shelf Drilling
5 Annual Rig Condition Survey/Certification Of Trident 08 Rig January 2015 Completed Shelf Drilling
6 Third Party Certification Dec 2014 Completed Niger Dock
7 Third Party Certification August 2014 Completed Saipem Contracting Nig. Ltd.
8 Third Party Certification August 2014 Completed Energy Works
9 Equipment Inspection & Re - Certification May 2014 Completed Ludof Nigeria Limited
10 Inspection & Certification of Lifting Gears April 2014 Completed Energy Works
11 Lifting Equipment & Inspection services April 2014 Completed Saipem Contracting Nig. Ltd
12 Testing & Certification of Manlift April 2014 Completed Aveon Offshore
13 Inspection & Recertification of Lifting Equipments April 2014 Completed EDMAC
14 Testing & Certification of Equipments March 2014 Completed Aveon Offshore
15 Visual Inspection, Tagging, Colour coding & Certification of Lifting Equipment Feb 2014 Completed Entrepose (Delattre Bezons Nigeria)
16 Visual Inspection, Tagging, Colour coding & Certification of Lifting Jan 2014 Completed Entrepose (Delattre Bezons Nigeria)
17 Inspection & Certification of Lifting Equipment ZB Base Ahoada Dec 2013 Completed ZB Joint Ventures
18 Inspection, Certification & Load testing of a Frame Nov 2013 Completed EuroFlow Design Limited
19 Inspection and certification of Lifting Equipments September 2013 Completed aipem Contracting Nig. Ltd
20 Testing & Certification of Lifting Equipments September 2013 Completed Aveon Offshore
21 Third Party Certification April 2012 Completed ZB Joint Ventures Ltd
22 Third Party Certification Sept 2011 Completed Entrepose (Delattre Bezons Nigeria)
23 Third Party Certification August 2011 Completed Aveon Offshores Nigeria Ltd
24 Inspection and Certification of Lifting Equipment Sep-2009 Completed Delattre Benzons Nigeria Limited
25 Certification of Rigging Gears Sep-2009 Completed Saipem Contracting Nigeria Ltd
26 Tank Volumetric Integrity Test on 13# BRT Tanks Sep-2009 Completed Mobil Producing Nigeria Unlimited
27 Visual Inspection, Functional Test, Load Testing and Certification of Wheeled Crane Aug-2009 Completed Saipem Contracting Nigeria Ltd
28 Hydrotesting of Valves Aug-2009 Completed Saipem Contracting Nigeria Ltd
29 Visual Inspection, Functional Test, Load Testing and Certification of Cranes, Manlift and Telescopic Fork Lift Aug-2009 Completed Saipem Contracting Nigeria Ltd
30 Inspection and Certification of Lifting Equipment Aug-2009 Completed Grinaker-LTA Construction Nigeria Ltd
31 Lifting Inspection, Certification, Tagging and Colour Coding of Lifting Tackles Jun-2009 Completed Saipem Contracting Nigeria Ltd
32 Hydrotesting / Magnetic Particle Testing on 16 Air Vessels Jun-2009 Completed Saipem Contracting Nigeria Ltd
33 Pressure Testing of Gas Cylinders ay-2009 Completed Total E & P
34 Rig Condition Survey/Certification of SEDCO 702 Rig SALDANHA Ship Yard/South Africa Feb 2014 Completed Transocean Support Services
35 Annual Rig Condition Survey/Certification of High Island RIG, Jackryan & Adriatic Jan 2014 Completed Transocean Support Services
36 Annual Rig Condition Survey Jan 2014 Completed ACME
37 Rig Condition Survey/Recertification of Adriatic X Rig Dec 2013 Completed Shelf Drilling Nig Limited/td>
38 Annual Rig Condition Survey of Nobel Percy Johns Dec 2013 Completed Noble Drilling Nig Ltd
39 Rig Condition Survey Jan 2011 Completed Noble Drilling Nigeria Ltd
40 Rig Condition Survey Jan 2011 Completed Transocean Support Services Ltd
41 Annual Rig Condition Survey Nov 2009 Completed Noble Drilling Nigeria Ltd
42 Annual Rig Condition Survey Oct-2009 Completed Tranocean Support Services
S/N Project Description Completion Date Status Client
1 Provision of Bolt Tensioning services for Bonga FPSO N/A Ongoing Shell Nigeria Exploration and Production Company
2 Provision of Bolt Tensioning Services Sea Eagle SPDC N/A Ongoing Shell Petroleum Development Company
S/N Project Description Completion Date Status Client
1 1Q15 & 1H15 Custody Meter & Flow Meter Calibration March 2015 Ongoing Mobil Producing Nigeria Unlimited
2 Inspection, Maintenance & Recertification of Lab Equipment at Erha FPSO N/A Ongoing Mobil Producing Nigeria Unlimited
3 Provision of Maintenance, Repair, Calibration & Recertification of Lab Equipments at all MPNU Field Locations N/A Ongoing Mobil Producing Nigeria Unlimited
4 Calibration of Monitoring Instruments August 2014 Completed Energy Works
5 Calibration/Recertification of Test Equipments August 2014 Completed Mobil Producing Nigeria Unlimited
6 Calibration of Sonatest Flaw Detectors August 2014 Completed Nigerdock
Niger Dock Calibration Contract N/A Ongoing Nigerdock
7 Calibration of Instruments July 2014 Completed Darlycet
8 Calibration of Flow/Dispensing Meters July 2014 Completed NigerDock
9 Calibration of 12,000 Litres PMS Storage Tank July 2014 Completed Nigerdock
10 Recertification of Hydraulic Jack July 2014 Completed Mobil Producing Nigeria Unlimited
11 Calibration and Certification of Fluke Infrared Thermometers & Fluke digital Clamp Meters July 2014 Completed NigerDock
12 Offshore Installation & Comm Ubit GB GasLift Milestone 4 June 2014 Completed Mobil Producing Nigeria Unlimited
13 Offshore Installation & Comm of Enang JE Gaslift Proj Milestone 4 June 2014 Completed Mobil Producing Nigeria Unlimited
14 Calibration of Batching Plant June 2014 Completed Saipem Contracting Nig. Ltd
15 Calibration of 20 Nos Test Equipments May 2014 Completed Mobil Producing Nigeria Unlimited
16 Repair, re –certification & maintenance of Environmental Lab equipment Feb 2014 Completed Mobil Producing Nigeria Unlimited
17 Annual PM on Lab Equipment at Yoho FSO Laboratory N/A Ongoing Mobil Producing Nigeria Unlimited
18 FUN Electrical & Instrumentation Project Inside QIT N/A Completed Frontier Oil Limited
19 Offshore Installation & Comm Ubit GB GasLift June 2013 Completed Mobil Producing Nigeria Unlimited
20 Offshore Installation & Comm of Enang JE Gaslift Project June 2013 Mobil Producing Nigeria Unlimited
21 Frame Agreement on Calibration and Certification of Instruments Jan 2011 Completed ZB ventures
22 Third Party Certification Sept 2011 Completed  
23 Inspection and Certification of Petroleum Product Storage facility Jan 2011 Completed  
24 Frame Agreement on Inspection and Certification of Lifting Equipment Jan 2011 Completed  
25 Frame Agreement on Calibration and Certification of Instruments Jan 2011 Completed  
26 Frame Agreement on Inspection and Certification of Lifting Equipment Jan 2011 Completed  
27 INSTRUMENTATION CALIBRATION FRAME AGREEMENT – OML 58 PROJECT Jan 2011 Completed  
28 INSPECTION SERVICES, EQUIPMENT RENTAL & CALIBRATION SERVICES FRAME AGREEMENT Jan 2011 Completed  
29 Supply of Calibration Analysis civil test equipments Dec 2009 Completed  
30 Surface Installation / calibration and Hydrostatic Test of 174, 000 litres capacity Tank Nov 2009 Completed
31 Supply of spare parts for speed boat and compressor Nov 2009 Completed
32 Repairs, servicing, Calibration and Recertification of Fuel and Dispensing Meters Nov 2009 Completed
33 Calibration and Recertification of Electrical and Test Instruments Nov-2009 Ongoing Mobil Producing Nigeria Unlimited
34 Calibration of welding Machines Oct-2009 Completed Delattre Benzons Nigeria Limited
35 UTI meters repair, recalibration and re-certification Oct-2009 Completed Mobil Producing Nigeria Unlimited
36 Calibration and Certification of Instruments Sep-2009 Completed Delattre Benzons Nigeria Limited
37 Certification of Rigging Gears Sep-2009 Completed Saipem Contracting Nigeria Ltd
38 Calibration and Certification of Instruments Jul-2009 Completed Saipem Contracting Nigeria Ltd
39 UTI meters repair, recalibration and re-certification Jul-2009 Completed Mobil Producing Nigeria Unlimited
40 Installation of Accelerated Gas Lift on Ubit E Jul-2009 Ongoing Mobil Producing Nigeria Unlimited
S/N Project Description Completion Date Status Client
1 Hire of 10 Bar 1000 CFM Diesel Driven Air Compressor 1 Complete With Air Dryer Jan - April 2015 Ongoing Niger Dock
2 Hire of 10 Bar 1000 CFM Diesel Driven Air Compressor 2 Complete With Air Dryer Jan - April 2015 Ongoing Niger Dock
3 Hire of 10 Bar 750 CFM Diesel Driven Air Compressor Complete With Air Dryer Dec 2014 – June 2015 Ongoing Niger Dock
4 Provision of Dry Air Compressor System August 2014 Completed MPNU